---
title: "Closed distribution system | MIND Park"
description: "MIND Real Estate, the company that manages MIND Park, is the licensed operator of the closed electricity distribution system. Operating rules and regulatory documentation."
url: "https://mind.rs/en/closed-distribution-system/"
language: en
---

   ![Aerial view of the industrial buildings and infrastructure of MIND Park](https://mind.rs/assets/mind/inner-pages/services-hero-desktop.webp)

MIND Real Estate / Closed distribution system operator

# MIND Park's closed distribution system.

MIND Real Estate, the company that manages MIND Park, is the licensed operator of the closed distribution system. The operating rules govern connection, power quality, system operation, access and metering.

[View the documentation](https://mind.rs/en/closed-distribution-system/#dokumentacija)

Regulatory documentation

## Documents governing the operation of the system.

The documents below relate to the operation of the closed distribution system. Contact the operator for contractual terms, technical requirements and the billing elements currently in force.

 ![Licence issued by the Energy Agency of the Republic of Serbia to MIND Real Estate for electricity distribution and operation of the closed distribution system](https://mind.rs/assets/mind/inner-pages/zds-license.webp)

AERS / Closed distribution system operator licence

1.  AERS / Licence / 15 April 2021
    
    ### Licence for electricity distribution and operation of the closed distribution system
    
    Licence issued to MIND Real Estate, registration number 0343/21-ПЕ-ДС, with a validity period of 10 years.
    
    [Open PDF (Serbian)](https://mind.rs/documents/zatvoreni-distributivni-sistem/licenca-aers.pdf)
2.  AERS / Decision 312-72/2020-L-I
    
    ### Decision of the Energy Agency of the Republic of Serbia
    
    The decision under which the licence for electricity distribution and operation of the closed distribution system was issued.
    
    [Open PDF (Serbian)](https://mind.rs/documents/zatvoreni-distributivni-sistem/resenje-aers-312-72-2020-l-i.pdf)
3.  Operating rules / 28 February 2022
    
    ### Operating rules of the MIND Real Estate closed distribution system
    
    The document governs connection, power quality, safe operation, system access, metering and the obligations of users and the operator.
    
    [Open PDF (Serbian)](https://mind.rs/documents/zatvoreni-distributivni-sistem/pravila-rada-zds-mind-real-estate.pdf)
4.  Amendment to the rules
    
    ### Decision amending part of the closed distribution system operating rules
    
    The decision amending part of the technical rules of the MIND Real Estate closed distribution system.
    
    [Open PDF (Serbian)](https://mind.rs/documents/zatvoreni-distributivni-sistem/izmena-pravila-rada-zds-mind-real-estate.pdf)
5.  Access charge / Applicable from 1 October 2025
    
    ### Decision on the charge for access to the closed distribution system
    
    The document sets out the tariff elements and the date from which they apply. Current billing arrangements and contractual terms should be confirmed directly with the operator.
    
    [Open PDF (Serbian)](https://mind.rs/documents/zatvoreni-distributivni-sistem/odluka-o-ceni-pristupa-zds.pdf)
